All Collections
Get Started
Setting up Vibe Device
How to set up the Vibe Board Pro 75" stand and OPS
How to set up the Vibe Board Pro 75" stand and OPS
Updated over a week ago

This article applies to the Vibe Board Pro 75″.

Assembly notes

  • Use the stand correctly and securely. Please read these instructions carefully before starting assembly.

  • Accommodates 55-86 inch smart boards by suggestion.

  • Max bearing weight is 100KG.

  • Material lists

  • Other Accessories (Unit: mm)

Installing the Stand

Please follow below instruction -

  1. Adjust the status of castor into braking and screw it into the stand foot.

  2. Lock the hanging holder on the side edge of one stand foot.

  3. Lock the hanging holder on the side edge of another stand foot.

  4. Fab the tray between two upright columns.

  5. According to actual demand for using the board, lock hanging strip on the board.

  6. Put the board on the hanging holder. Make sure braking is locked.

Remark: There are some cases that hanging strip self owned by board can not matched with the stand,need to be used with hanging panel.

  • Lock hanging panel on the holder

The display after assembly completion is shown as following

Installing the OPS


💡 Tip

Need more help?

Send an email to our Support Team or Submit a Support Ticket.


Did this answer your question?